PROTOTYPE INSTALLED........
JOB DONE
i have made my final fitting of the prototype earthing kit....
the original measurements went very well, however, i would like to change three lengths, IF we go forward..... (one needs to be 2 inches shorter, and one needs to be three inches longer, and one needs a bigger eyelet )
all in all, i think i have found VERY stout grounding points. also, i was able to utilize two of the oem grounds, and the battery negative, further enforcing their effect (i hope)
the rear (underbelly, chassis to muffler flange) ground goes from a 10mm nut (chassis) to a 14mm nut (flange), needing an eyelet of about ¼" bigger diameter to fit onto the flange bolt....
that aside i will drive and make observations....
gone for now - time to see what's up!
SMS